Application of the PERT scheduling technique to a nursery operation

dc.contributor.authorLudwick, Beverly A., author
dc.date.accessioned2023-01-27T14:51:07Z
dc.date.available2023-01-27T14:51:07Z
dc.date.issued1979
dc.descriptionCovers not scanned.
dc.description.abstractImproved management techniques are needed by the nursery industry as methods of control and scheduling have failed to keep pace with rapid growth. PERT (Program Evaluation and Review Technique) is a management system which could have useful application to the nursery industry. The PERT system was developed by the United States Navy to coordinate the Polaris submarine program, and is based on a critical path network which allows the user to see important interrelationships. Analysis of these interrelationships allows for the improved coordination, control, and scheduling of a project. The purpose of this study is to investigate the feasibility of applying PERT to nursery production and using the PERT concept in a nursery management classroom. A broad, general network of production activities was developed based on information provided by 13 nurseries. Bailey Nurseries, Inc. of St. Paul, Minnesota, supplied the estimated time durations for each activity in the network. This study deals with three species: Lonicera sp., Cotoneaster sp., and Fraxinus pennsylvanica. Time durations were assigned to each activity necessary in the production of that particular species; each activity was assigned either a date that activity would begin or a date it would be completed. This information was prepared for the computer and reports were generated. The reports which are derived from using the PERT system allow the user to see an overview of the entire operation. Therefore, the effect management's decisions have on interrelated activities can be closely observed and monitored. Though the scope of this study is general, it would appear that the logic and organization necessary in the development of PERT as a nursery management system could greatly benefit the nursery industry and be useful in teaching nursery principles of business and technology.
dc.format.mediummasters theses
dc.identifier.urihttps://hdl.handle.net/10217/236112
dc.languageEnglish
dc.language.isoeng
dc.publisherColorado State University. Libraries
dc.relationCatalog record number (MMS ID): 991002409289703361
dc.relationSB88.6.L84
dc.relation.ispartof1950-1979
dc.rightsCopyright and other restrictions may apply. User is responsible for compliance with all applicable laws. For information about copyright law, please see https://libguides.colostate.edu/copyright.
dc.subject.lcshNurseries (Horticulture)
dc.subject.lcshCritical path analysis
dc.titleApplication of the PERT scheduling technique to a nursery operation
dc.typeText
dcterms.rights.dplaThis Item is protected by copyright and/or related rights (https://rightsstatements.org/vocab/InC/1.0/). You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).
thesis.degree.disciplineHorticulture
thesis.degree.grantorColorado State University
thesis.degree.levelMasters
thesis.degree.nameMaster of Science (M.S.)

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
ETDF_1979_Sp_Ludwick_Beverly_DIP.pdf
Size:
20.78 MB
Format:
Adobe Portable Document Format

Collections